    Quote Originally Posted by scottz63 View Post
    How much are those steel shipping containers?
    Scott I misread the price I wrote down - they are $2,300 - as I am buying 3 they dropped price to $2,100.00 ea. Not a heck of lot more than a gun safe and
    at 160 square feet each a heck of a lot bigger. 3 will give me 480 total square feet of enhanced security to store things. With all bolted down to concrete I
    could used the one sandwiched between the other two as a storm shelter.
    Last edited by Buckshot; 01-26-2017 at 12:06 PM.
    Occam's razor, the simplest explanation will be the most plausible

  2. #22
    Senior Veteran
    scottz63's Avatar
    Join Date
    Apr 2014
    Location
    Central Mo.
    Posts
    2,047
    Rep Power
    164
    Quote Originally Posted by Buckshot View Post
    Scott I misread the price I wrote down - they are $2,300 - as I am buying 3 they dropped price to $2,100.00 ea. Not a heck of lot more than a gun safe and
    at 160 square feet each a heck of a lot bigger. 3 will give me 480 total square feet of enhanced security to store things. With all bolted down to concrete I
    could used the one sandwiched between the other two as a storm shelter.
    That's really not too bad. Now my gears are working. Lol
    14EH AIT Instructor-PATRIOT Fire Control Enhanced Operator/Maintainer

  3. #23
    Buckshot's Avatar
    Join Date
    Dec 2011
    Location
    Northwest corner, Arkansas
    Posts
    10,963
    Rep Power
    629
    Quote Originally Posted by scottz63 View Post
    That's really not too bad. Now my gears are working. Lol
    If you are not worried about cosmetics, etc, you can get them cheaper than that. As I mentioned the ones I am getting are one time use containers and grade "A".
    As they will be permanently inside and part of the decor of the building (that I will be using a lot) I wanted them to look good. BTW that is a delivered price.
    Occam's razor, the simplest explanation will be the most plausible

  4. #24
    Senior Veteran sdk1968's Avatar
    Join Date
    Feb 2008
    Posts
    2,326
    Rep Power
    269
    BS,

    round where i live... 20's are running $1995 delivered... but im sure they arent 1 time use boxes.

    your last post of using 3 20's side by side is actually much better than using 40's for inside a building. 40's are great out on their own.. but if you build a 25'x50' building? you want 3 20's next to each other.

    thats a really nice set up & easy to arrange however you want. vault in the middle... storage on either side... or flip it all. still leaves you plenty of building to use for shop & so on.

    nice plan.
    say what you mean & mean what you say!
    TEC Tactical=SOT/07 i work there.

  5. #25
    Senior Veteran nevada's Avatar
    Join Date
    Mar 2007
    Location
    Nevada -West of the Strip
    Posts
    4,643
    Rep Power
    258
    Don't forget the gun ports.
    RRRROOOWWWRRR PHHT PHHT I AM THE FORCE!

  6. #26
    Buckshot's Avatar
    Join Date
    Dec 2011
    Location
    Northwest corner, Arkansas
    Posts
    10,963
    Rep Power
    629
    Went over my requirements and locked down the price on a 30X40 metal building meeting my requirements, double walled, insulation package, so on. Paperwork
    drawn up for delivery last week in Feb. Heard for the 4th time that the guy (builder) I have is very good, so feeling good on him. So right now I have
    the builder, building kit, and sea/land containers locked in. Starting construction end of Feb. Still have to work on what I want for wiring, heat/air, etc.
    Going to try and put in wood stove, backed up by propane heater. Will likely just dehumidify the storage containers, not the whole structure. Costs
    quickly escalate.
    Occam's razor, the simplest explanation will be the most plausible

  7. #27
    Senior Veteran
    scottz63's Avatar
    Join Date
    Apr 2014
    Location
    Central Mo.
    Posts
    2,047
    Rep Power
    164
    Quote Originally Posted by Buckshot View Post
    Went over my requirements and locked down the price on a 30X40 metal building meeting my requirements, double walled, insulation package, so on. Paperwork
    drawn up for delivery last week in Feb. Heard for the 4th time that the guy (builder) I have is very good, so feeling good on him. So right now I have
    the builder, building kit, and sea/land containers locked in. Starting construction end of Feb. Still have to work on what I want for wiring, heat/air, etc.
    Going to try and put in wood stove, backed up by propane heater. Will likely just dehumidify the storage containers, not the whole structure. Costs
    quickly escalate.
    That's awesome. Are you going to have the slab poured before then or wait until the end of Feb?
    14EH AIT Instructor-PATRIOT Fire Control Enhanced Operator/Maintainer

  8. #28
    Buckshot's Avatar
    Join Date
    Dec 2011
    Location
    Northwest corner, Arkansas
    Posts
    10,963
    Rep Power
    629
    Quote Originally Posted by scottz63 View Post
    That's awesome. Are you going to have the slab poured before then or wait until the end of Feb?
    The builder is handling the slab and putting up the building, so it will all get started then. He has plans at what stage he wants to move the 3 steel sea/land containers in. Let
    him handle that -that is what he is getting paid for (LOL).
    Occam's razor, the simplest explanation will be the most plausible

  9. #29
    Senior Veteran
    scottz63's Avatar
    Join Date
    Apr 2014
    Location
    Central Mo.
    Posts
    2,047
    Rep Power
    164
    Yes it is.
    14EH AIT Instructor-PATRIOT Fire Control Enhanced Operator/Maintainer

  10. #30
    Senior Veteran sdk1968's Avatar
    Join Date
    Feb 2008
    Posts
    2,326
    Rep Power
    269
    BS,

    since your going to this kind of set up/work....... make him sign a non disclosure agreement on the construction (that your putting those boxes inside)....

    it wont do you a bit of good to have that set up if he would flap his gums at the local watering hole about the set up.... then all that hard work is for nothing when someone catches you gone & shows up with a rescue saw... they would still be into those boxes in just a few minutes tops.

    thats how we cut them open in a hurry..
    say what you mean & mean what you say!
    TEC Tactical=SOT/07 i work there.

Similar Threads

  1. MRE Storage, Etc
    By Buckshot in forum Preparedness
    Replies: 8
    Last Post: 05-07-2016, 09:08 AM
  2. storage
    By Planning in forum General Discussion
    Replies: 4
    Last Post: 02-22-2010, 03:28 PM
  3. gun storage
    By romagnus in forum Cetme/HK
    Replies: 13
    Last Post: 03-25-2009, 08:29 PM
  4. Building a suomi- any companies building them?
    By kevin in forum General Discussion
    Replies: 6
    Last Post: 09-02-2008, 12:23 AM
  5. GP-11 Storage
    By tanstaafl4y in forum Ammunition
    Replies: 4
    Last Post: 08-03-2007, 07:40 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •