Page 14 of 14 FirstFirst ... 4121314
Results 131 to 134 of 134

Thread: Cetme L build planning

  1. #131
    holescreek's Avatar
    Join Date
    Oct 2009
    Location
    Centerville, OH
    Posts
    4,330
    Rep Power
    404
    I had a Logan 820 for several years that came with both tailstocks. I got tired of tripping over the turret tailstock and sold it to a guy in KS.

  2. #132
    Veteran
    Join Date
    Nov 2017
    Posts
    66
    Rep Power
    12
    Well, from what I can see, the 820-1 had a lever action tailstock that would work great for drilling and slotting internal keyways, and the 820-2 had the 5 position turret tailstock with the capstan wheel type handle. There was another 820-21 that came with the turret tailstock, and a double-toolpost cross slide that had a lever on it. All would be cool to have but I can totally see how tripping over them would get old. I've seen examples of all three on ebay lately, so eventually I will pick up a lever tailstock, as it combines both the handwheel feed and the lever action in one unit.

  3. #133
    Veteran
    Join Date
    Nov 2017
    Posts
    66
    Rep Power
    12
    Well, looks like I'm stuck with the locking piece I made already-I just got let go at work friday. Company was sold and the whole engineering staff was let go.

    Means I no longer have access to a surface grinder, so I can't remake the locking piece.

  4. #134
    holescreek's Avatar
    Join Date
    Oct 2009
    Location
    Centerville, OH
    Posts
    4,330
    Rep Power
    404
    Quote Originally Posted by Xnke View Post
    Well, looks like I'm stuck with the locking piece I made already-I just got let go at work friday. Company was sold and the whole engineering staff was let go.

    Means I no longer have access to a surface grinder, so I can't remake the locking piece.
    They couldn't have picked a better time of the year for it could they? I know, there's never a good time. On the bright side, there's such a shortage of workers in this state it won't take long to get re-employed.

Similar Threads

  1. A Big Plus 1 For Planning
    By 7.62guy in forum Seller/Buyer Feedback
    Replies: 3
    Last Post: 05-07-2013, 10:18 PM
  2. Another +1 for Planning
    By pidaster in forum Seller/Buyer Feedback
    Replies: 0
    Last Post: 02-15-2013, 07:56 PM
  3. Build planning for CETME - Modelo G Hypothetical Design Ideas
    By r.erichsen in forum Cetme/HK Building Resources
    Replies: 13
    Last Post: 09-16-2011, 05:28 PM
  4. MSG90A2 build- Cetme Build Tutorial
    By dirty8 in forum Cetme/HK Building Resources
    Replies: 39
    Last Post: 04-10-2011, 10:14 AM
  5. Cetme Build, G3 or CETME Rear Sight?
    By landtoy80 in forum Cetme/HK
    Replies: 9
    Last Post: 12-04-2008, 11:36 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •